Quantcast
Channel: Practical Machinist - Largest Manufacturing Technology Forum on the Web - Mazak
Viewing all articles
Browse latest Browse all 2364

Multiple parts from a short bar using shift on T plus

$
0
0
Need to run a couple hundred parts from 6061 2.5" tube 1" long. Very simple part, just a clean up on the OD and ID and part off to length but our SQT15 only has a 2" bore. Plan is to saw into maybe a 5.5" length to cut 4 pieces using a shift distance on the end line of the program.

Never used it but seems pretty straight forward to program, any tips or advise on this?

Not sure if we can get them to drop off without dinging them up too bad, so may have to leave a bit and snap them off by hand. If that is the case then on the end line do you simply mark no for continue?

Thanks in advance.

Viewing all articles
Browse latest Browse all 2364

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>